SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Market 3.12 · Aviation

Aviation, rebuilt between departures.

Terminals, airside works, hangars and airport modernisation delivered while flights, passengers and security keep moving.

Market3.12
Pressures3
Key services6
SectorAviation
StatusActive
The market

An airport never closes. Neither can its construction plan.

Airport work happens inside a live operation. Gates, stands, taxiways and passenger flows must stay available, airside access is controlled minute by minute, and systems such as baggage handling and security screening must be switched over without stranding a single traveller. Airlines, the operator and regulators all need to know what changes, and when.

Schedola phases aviation programs around operations: night and off-peak work windows, gate and stand takeovers, passenger-flow continuity and systems cutovers, all held in one schedule the operator can plan around. 4D sequences help airlines and stakeholders see each phase before it happens.

What is at stake

What keeps aviation leaders awake

The specific risks of this market, named plainly. We plan for them from day one, because we have worked inside them.

RISK-01

Live-operations phasing

Construction that keeps gates, stands, runways and passenger routes in service.

RISK-02

Systems cutovers

Baggage, screening and IT systems switched over without disruption to flights.

RISK-03

Airside rules

Short work windows, escorts and safety controls on an active airfield.

The best airport project is one the passengers walk through without ever noticing.
Our conviction in Aviation
Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

Can you plan a phased terminal program?

Yes. We develop phasing plans that keep gates and passenger processing in service throughout construction.

Do you use 4D planning on airports?

Often. A 4D sequence is one of the clearest ways to explain phasing to an operator, airlines and regulators.

Explore further

Other markets

3.13

Water & Wastewater

Treatment plants, conveyance and resilience programs that must meet regulatory dates while the plant keeps treating.

3.14

Power

Generation, transmission, renewables and storage — the infrastructure that the grid, and every new data center, is waiting on.

3.15

Oil & Gas

Upstream, midstream and downstream capital projects, plant outages and brownfield work in demanding, hazardous environments.

3.16

Government

Federal, state and municipal capital programs held to strict standards of compliance, transparency and stewardship.

3.01

Data Centers

Hyperscale, colocation and AI campuses, where the real deadline is energised white space and the cost of a slip is counted in megawatts nobody can rent.

3.02

Mission Critical

Network hubs, operations and control centres, emergency services and secure facilities that are upgraded while they keep running.

3.03

Commercial

Office towers, mixed-use, hospitality and retail, where the completion date is already written into leases, loans and launch plans.

3.04

Industrial

Process plants, heavy industrial facilities and large EPC programs where engineering, procurement and construction run at once.

3.05

Manufacturing

Advanced manufacturing, automotive, battery and gigafactory programs where the business case is written around the first saleable unit.

3.06

Distribution Centers

Fulfilment, logistics and cold-storage facilities delivered in regional and national programs on tight, repeatable timelines.

3.07

Healthcare

Hospitals, medical centres and research facilities built and renovated while care continues next door.

3.08

Pharmaceutical

GMP manufacturing, laboratories and life-sciences facilities whose true finish is set by commissioning, qualification and validation.

3.09

Semiconductor

Fabs, cleanrooms and advanced packaging plants: some of the most complex and capital-intensive buildings ever attempted.

3.10

Food & Beverage

Processing, bottling and cold-chain facilities for brands people buy every week, often expanded inside plants that never stop.

3.11

Transportation

Highways, bridges, transit and rail programs delivered in full public view, with commuters, councils and taxpayers watching.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch