Last Planner® Support
Implementation and coaching of the Last Planner® System to raise plan reliability and keep work flowing on site.

Commitments made weekly, kept weekly.
Most site plans fail not because they are badly made but because the work was never ready: a missing drawing, an open RFI, material still on a truck. The Last Planner® System tackles this directly, through make-ready planning, weekly commitments and learning from every commitment that is missed.
We implement and coach the whole system: master and phase planning, look-ahead and constraint removal, weekly work planning and daily huddles. We measure Percent Plan Complete and use the reasons behind each miss to improve. Our aim is to build the capability inside your team, so it keeps running after we step back.
What we bring to Last Planner® Support
Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.
System implementation
Rollout across the connected conversations of the Last Planner® System.
INCLUDEDMake-ready process
Constraints identified and removed ahead of the work.
INCLUDEDWeekly work planning
Facilitated commitment meetings that produce reliable weekly plans.
INCLUDEDPPC & variance analysis
Percent Plan Complete tracked, with the root causes of misses analysed.
INCLUDEDField coaching
Superintendents and trade leads coached until the system runs without us.
INCLUDEDDigital setup
Lean planning platforms configured and connected to project controls.
INCLUDEDA clear path, milestone by milestone.
A disciplined sequence, so you always know what happens next, who owns it and why it matters.
What you receive
- 01Implementation roadmap
- 02Make-ready and constraint logs
- 03Weekly work plans and PPC metrics
- 04Root-cause analysis of misses
- 05Coaching plan and field guides
- 06Lean maturity assessment
Technology we work in
Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.
What changes when we arrive.
Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.
More commitments kept, so work flows more smoothly.
Fewer crews standing by for drawings, materials or other trades.
Teams who run lean planning themselves.
What leaders ask us first.
Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.
What is Percent Plan Complete?
The share of weekly commitments completed as planned. It is a simple, telling measure of planning reliability and the starting point for improvement.
How long does implementation take?
Initial rollout usually takes six to twelve weeks. Lasting improvement comes from consistent practice over the following months.
Is Last Planner® a trademark?
Yes. Last Planner® is a registered trademark of the Lean Construction Institute. We implement the system in line with its published principles.
Look-Ahead Planning
Rolling look-ahead plans that turn the master schedule into ready, resourced, constraint-free work for the field.
Shutdown Scheduling
Hour-by-hour shutdown schedules that shorten outage windows and return critical assets to service safely and on time.
Commissioning & Startup Scheduling
System-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation.
See your finish from here.
Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch