Transportation, public works, publicly trusted.
Highways, bridges, transit and rail programs delivered in full public view, with commuters, councils and taxpayers watching.

A city waiting for a bridge deserves a date it can believe.
Transportation programs are long, visible and political. They depend on right-of-way, utility relocations, environmental windows, possessions and funding cycles, many of them outside the contractor’s control. When dates move, commuters, businesses and elected officials feel it, and confidence is hard to rebuild.
Schedola supports agencies, program managers and contractors with program-level schedules, traffic staging and phasing plans, cost and earned value control and reporting that public stakeholders can follow. When third parties move, we show the impact clearly; when disputes arise, we keep the record clean.
What keeps transportation leaders awake
The specific risks of this market, named plainly. We plan for them from day one, because we have worked inside them.
Third-party dependencies
Right-of-way, utilities and permits that sit outside the project’s direct control but on its critical path.
Keeping traffic moving
Staging and phasing that keeps the public travelling while work progresses.
Public accountability
Reporting to agencies, boards, elected officials and communities that has to stand up to scrutiny.
The services that matter most here
Program-wide control and reporting the public can follow, from right-of-way to opening day.
Program-level controls that bind projects, contractors and funding streams into a single governed picture sponsors can steer by.
01.03Integrated Master Scheduling (IMS)Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
02.06Earned Value Management (EVM)Earned value systems that join scope, schedule and cost to measure performance objectively and forecast with evidence.
04.01Delay AnalysisRetrospective and contemporaneous delay analysis that identifies the critical delays, measures them and allocates responsibility, using a method chosen to fit the records and the contract.
04.05Claims SupportPreparation, review and defence of construction claims for delay, disruption, acceleration and change, in close partnership with counsel.
02.10Executive ReportingShort, honest, decision-led reporting and live executive views for boards, CFOs, lenders and public stakeholders.
When the public is paying, the schedule should be something anyone can read and trust.Our conviction in Transportation
What leaders ask us first.
Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.
Do you work for public agencies?
Yes. We support transportation departments, transit authorities and their program managers with scheduling, cost and reporting.
Can you plan traffic staging?
Yes. Staging and phasing are built into the schedule so construction sequence and traffic impact are planned together.
Other markets
3.12Aviation
Terminals, airside works, hangars and airport modernisation delivered while flights, passengers and security keep moving.
3.13Water & Wastewater
Treatment plants, conveyance and resilience programs that must meet regulatory dates while the plant keeps treating.
3.14Power
Generation, transmission, renewables and storage — the infrastructure that the grid, and every new data center, is waiting on.
3.15Oil & Gas
Upstream, midstream and downstream capital projects, plant outages and brownfield work in demanding, hazardous environments.
3.16Government
Federal, state and municipal capital programs held to strict standards of compliance, transparency and stewardship.
3.01Data Centers
Hyperscale, colocation and AI campuses, where the real deadline is energised white space and the cost of a slip is counted in megawatts nobody can rent.
3.02Mission Critical
Network hubs, operations and control centres, emergency services and secure facilities that are upgraded while they keep running.
3.03Commercial
Office towers, mixed-use, hospitality and retail, where the completion date is already written into leases, loans and launch plans.
3.04Industrial
Process plants, heavy industrial facilities and large EPC programs where engineering, procurement and construction run at once.
3.05Manufacturing
Advanced manufacturing, automotive, battery and gigafactory programs where the business case is written around the first saleable unit.
3.06Distribution Centers
Fulfilment, logistics and cold-storage facilities delivered in regional and national programs on tight, repeatable timelines.
3.07Healthcare
Hospitals, medical centres and research facilities built and renovated while care continues next door.
3.08Pharmaceutical
GMP manufacturing, laboratories and life-sciences facilities whose true finish is set by commissioning, qualification and validation.
3.09Semiconductor
Fabs, cleanrooms and advanced packaging plants: some of the most complex and capital-intensive buildings ever attempted.
3.10Food & Beverage
Processing, bottling and cold-chain facilities for brands people buy every week, often expanded inside plants that never stop.
See your finish from here.
Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch