Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Planning & Scheduling

CPM Scheduling

Critical Path Method schedules with complete logic, grounded durations and a critical path you can manage by, report on and defend.

Practice01 Planning & Scheduling
Service01 of 18
Capabilities6
Deliverables6
StatusAvailable now
In short

Know which work decides your completion date, before it decides for you.

The Critical Path Method is the most useful planning tool a project has, and one of the easiest to misuse. Open-ended activities, dates forced in with constraints and durations padded for comfort produce schedules that look finished and predict nothing. The problem only shows when the date is already gone.

We build CPM networks from the work outward. Each activity exists because the scope requires it, each relationship reflects how the trades actually hand off, and the critical path falls out of the logic rather than being drawn in afterwards. You get a model that forecasts, not one that simply records what has already happened.

What's included

What we bring to CPM Scheduling

Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.

C-01

Network logic

Complete predecessor and successor logic using the right relationship types, with every lag justified and written down.

INCLUDED
C-02

WBS & activity coding

Work breakdown, codes and calendars designed for both site execution and executive reporting, so one file serves both audiences.

INCLUDED
C-03

Duration development

Durations calculated from quantities, crew sizes and productivity rates for the trade, the region and the season.

INCLUDED
C-04

Calendars & constraints

Working calendars, weather allowances and constraints applied on purpose and recorded, never used to hide a problem.

INCLUDED
C-05

Float visibility

Total and free float tracked and reported, so contingency is visible and someone is accountable for it.

INCLUDED
C-06

Specification compliance

Schedules written to your contract’s scheduling specification from the outset, so submittals are accepted and payment is not held up.

INCLUDED
How it works

A clear path, milestone by milestone.

A disciplined sequence, so you always know what happens next, who owns it and why it matters.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Listen

We take in the scope, the contract, the means and methods and every date already committed to someone.

PHASE 02Structure

We design the WBS, codes and calendars around how you will run the job and report it.

PHASE 03Build

We develop logic and durations with your field leaders, one area and one trade at a time.

PHASE 04Prove

We run quality diagnostics, walk the critical path with you and issue a schedule you can stand behind.

Deliverables

What you receive

  • 01Fully logic-linked CPM schedule in native format (XER, XML or MPP)
  • 02Basis of schedule and narrative
  • 03Critical and near-critical path reports
  • 04WBS dictionary and activity code structure
  • 05Calendar and constraint register
  • 06One-page executive summary schedule
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.

Outcomes

What changes when we arrive.

Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.

Outcome 01Dates people accept

A critical path your owner, lender or contractor reviews without a fight.

Outcome 02Warning while it is cheap

Slippage visible months earlier, while options still exist.

Outcome 03Approved first time

Submittals that meet the specification, protecting your payment cycle.

Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

How detailed should a CPM schedule be?

Detailed enough to manage the work and measure progress honestly, and no more. As a working rule we keep most construction activities shorter than one or two update periods, then adjust for the phase of the project and what your contract requires. Too little detail hides risk; too much buries it.

Can you work in the platform we already use?

Yes. We build natively in Primavera P6, Oracle Primavera Cloud and Microsoft Project, and convert between them when a contract or partner requires it, checking that logic and calendars survive the conversion.

Do you schedule for owners or for contractors?

Both. We work for owners, program managers, general contractors and specialty trades. On any single project we act for one party only, so our advice is never divided.

We already have a schedule. Do we need to start over?

Rarely. We usually begin with a health check, keep what is sound, repair what is not and document every change, so you keep continuity with the record you already have.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch