Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Planning & Scheduling

Shutdown Scheduling

Hour-by-hour shutdown schedules that shorten outage windows and return critical assets to service safely and on time.

Practice01 Planning & Scheduling
Service17 of 18
Capabilities6
Deliverables6
StatusAvailable now
In short

When every hour offline is lost output, every hour is planned.

A shutdown is a race against a clock measured in lost production. Thousands of tasks, hundreds of workers and dozens of contractors converge on one asset for days or weeks, and a single missed sequence can extend the outage and multiply its cost.

We plan shutdowns at the detail they demand: hour by hour, shift by shift, with isolations, permits, scaffolding, cranes and inspection holds woven into one integrated plan. During execution we update the schedule continuously, so supervisors always know what is next, what is at risk and what the restart time really looks like.

What's included

What we bring to Shutdown Scheduling

Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.

C-01

Scope freeze

The work list challenged and frozen to protect the outage window.

INCLUDED
C-02

Hourly scheduling

Shift-level schedules with crews, equipment and permits.

INCLUDED
C-03

Isolation sequencing

Lock-out, tag-out, isolation and de-isolation logic built into the plan.

INCLUDED
C-04

Window compression

Parallel paths, prefabrication and added crews used to shorten the outage.

INCLUDED
C-05

Execution control

Shift-by-shift updates and recovery planning throughout the outage.

INCLUDED
C-06

Post-outage review

Performance analysis that makes the next shutdown shorter.

INCLUDED
How it works

A clear path, milestone by milestone.

A disciplined sequence, so you always know what happens next, who owns it and why it matters.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Scope

We validate and freeze the work list with operations and maintenance.

PHASE 02Plan

We build an integrated hour-by-hour plan with every contractor.

PHASE 03Control

We run the shutdown schedule in real time, shift by shift.

PHASE 04Review

We review performance and carry improvements into the next one.

Deliverables

What you receive

  • 01Frozen shutdown scope and work list
  • 02Hour-by-hour shutdown schedule
  • 03Isolation and permit sequence
  • 04Shift reports and restart forecasts
  • 05Execution recovery plans
  • 06Post-shutdown performance review
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.

Outcomes

What changes when we arrive.

Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.

Outcome 01Shorter outages

Assets back in production sooner.

Outcome 02Safer execution

Isolation and permit logic built into the plan from the start.

Outcome 03Restart times you can rely on

Return-to-service forecasts leadership can plan around.

Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

How early should shutdown planning start?

For major shutdowns, months ahead. Scope freeze, long-lead materials and contractor mobilization all need time, and most overruns are decided by what was or was not prepared.

Do you support round-the-clock execution?

Yes. Our planners work the shift pattern during execution, updating and recovering the schedule continuously.

Which facilities do you support?

Process plants, power generation, pharmaceutical and food production, manufacturing, water treatment and mission-critical facilities: anywhere an outage window has to be planned to the hour.

How do you handle emergent work found during the outage?

Through a controlled process that assesses each new item’s effect on the critical path before it is accepted, so discoveries are managed rather than allowed to quietly extend the window.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch