SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Advisory & Assurance

Constructability Reviews

Experienced reviews of design and sequence that remove construction risk before it reaches the field.

Practice03 Advisory & Assurance
Service07 of 09
Capabilities6
Deliverables6
StatusAvailable now
In short

Solve it on paper, where it costs almost nothing.

A design problem found in the field costs many times what it would have cost on the drawing. Clashes, impractical sequences, inaccessible spaces, unbuildable details and missing information all turn into RFIs, delays and change orders once work starts, and the schedule pays for every one.

Schedola’s constructability reviews put experienced builders’ eyes on the design before it is issued. We review drawings, models and specifications for buildability, sequence, logistics and schedule impact, and give the design team practical recommendations ranked by risk and cost.

What's included

What we bring to Constructability Reviews

Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.

C-01

Buildability

Details and assemblies reviewed for practical construction.

INCLUDED
C-02

Sequence & logistics

Access, laydown, crane coverage and sequencing evaluated.

INCLUDED
C-03

Model-based review

BIM coordination and clash review in support of constructability.

INCLUDED
C-04

Schedule impact

Design choices assessed for their effect on duration.

INCLUDED
C-05

Specification review

Specifications checked for clarity, availability and conflicts.

INCLUDED
C-06

Prefabrication options

Off-site and modular opportunities identified early.

INCLUDED
How it works

A clear path, milestone by milestone.

A disciplined sequence, so you always know what happens next, who owns it and why it matters.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Review

We examine design documents and models.

PHASE 02Rank

We log each issue by severity and schedule impact.

PHASE 03Workshop

We resolve issues with the design team, face to face.

PHASE 04Verify

We confirm resolutions in later design issues.

Deliverables

What you receive

  • 01Constructability review report
  • 02Prioritised issue log
  • 03Marked-up drawings and models
  • 04Sequence and logistics recommendations
  • 05Prefabrication opportunity assessment
  • 06Design team workshop
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.

Outcomes

What changes when we arrive.

Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.

Outcome 01Fewer RFIs

Questions answered before construction begins.

Outcome 02A faster build

Sequences and details designed for pace.

Outcome 03Lower cost

Changes avoided rather than paid for.

Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

At which design stages should reviews happen?

Ideally at schematic design, design development and before construction documents are issued. The earlier the review, the more it saves.

Do you review BIM models?

Yes. Model-based constructability and coordination reviews are often the most efficient route, and they let us test sequence and access in three dimensions.

Who acts on the recommendations?

The design team, with the owner’s support. We run workshops so each recommendation is understood, agreed and tracked to closure.

Is this useful on design-build projects?

Yes. On design-build the review protects the owner’s requirements and gives an independent read on whether the proposed sequence supports the contract dates.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch