Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Planning & Scheduling

Integrated Master Scheduling (IMS)

Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.

Practice01 Planning & Scheduling
Service03 of 18
Capabilities6
Deliverables6
StatusAvailable now
In short

Many contractors, many schedules, one view of the finish.

Large programs rarely fail inside one contract. They fail at the seams: between designer and builder, between procurement and site, between one contractor’s schedule and the next. Each party can report green while the program as a whole is quietly losing months.

An Integrated Master Schedule closes those seams. We connect every contributing schedule through controlled interface milestones and clear vertical traceability, from the few dates your board watches to the field activities that drive them. When something slips anywhere, you see where it lands everywhere.

What's included

What we bring to Integrated Master Scheduling (IMS)

Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.

C-01

Program architecture

Master, intermediate and detailed schedule levels linked with clear vertical traceability.

INCLUDED
C-02

Interface control

Hand-offs between contractors, designers and suppliers defined, owned and tracked as milestones.

INCLUDED
C-03

Earned value alignment

Structure that supports ANSI/EIA-748 earned value requirements where your program needs them.

INCLUDED
C-04

Contractor integration

Each contractor’s submission received, checked and integrated every period without re-keying.

INCLUDED
C-05

Schedule risk analysis

Monte Carlo analysis at program level to show how likely the key dates really are.

INCLUDED
C-06

Program narratives

Monthly narratives that explain movement, driving paths and corrective actions in plain language.

INCLUDED
How it works

A clear path, milestone by milestone.

A disciplined sequence, so you always know what happens next, who owns it and why it matters.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Frame

We set the program hierarchy, integration rules and the interface points that matter.

PHASE 02Connect

We bring in each contributing schedule and link them through controlled interfaces.

PHASE 03Verify

We test traceability, logic and driving paths across the whole program.

PHASE 04Run

We operate the monthly integration cycle and report the program’s true position.

Deliverables

What you receive

  • 01Integrated Master Schedule and program master plan
  • 02IMS data dictionary and integration rules
  • 03Interface milestone register
  • 04Program-level critical path reports
  • 05Schedule risk assessment with confidence levels
  • 06Monthly IMS narrative and reporting pack
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.

Outcomes

What changes when we arrive.

Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.

Outcome 01Program-wide sight lines

Every party’s effect on the end date visible in one place.

Outcome 02Fewer surprises at the seams

Interface risks found early, before they turn into claims.

Outcome 03One forecast for the board

A single defensible view instead of a dozen competing ones.

Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

What is the difference between an IMS and a master schedule?

A master schedule is usually a summary. An IMS is fully integrated: logically connected across every contributor and traceable from summary milestones down to detailed activities, so a change at the bottom shows its effect at the top.

Do you support federal and defense IMS requirements?

Yes. We structure schedules in line with ANSI/EIA-748 earned value principles and the IMS expectations common on federal and defense programs.

Our contractors use different software. Is that a problem?

Not if it is managed from day one. We set integration standards and data formats at the outset, then convert and validate each submission so the integrated schedule stays clean month after month.

How long before an IMS is useful?

A first integrated view is normally possible within weeks. It becomes more reliable each cycle as contributors align to the integration rules.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch