The scheduling platform of record on most large capital programs, configured and used by people who read it fluently.

P6 will model anything you give it. The skill is giving it the truth.
Product names are trademarks of their owners. Schedola is independent of every vendor.
Primavera P6 sits at the center of most large capital programs for good reason. It handles deep logic networks, enterprise coding, multiple calendars, resource and cost loading and multi-project structures at a scale few tools can match. That same power means it will faithfully calculate a misleading schedule if the logic, durations or settings behind it are wrong.
Schedola planners work in P6 daily. We set up enterprise structures and coding so portfolios can be compared and reported consistently, build and update schedules to specification, check scheduling options and calendars that quietly change results, and prepare P6 data so it supports earned value, risk analysis and, when needed, forensic review.
Primavera P6, in expert hands
Software does not control projects. People who know it deeply, and know what the board needs to hear, do.
Enterprise setup
EPS, OBS, global codes, calendars and permissions designed for consistent reporting across a portfolio.
Schedule development
Logic-driven baselines and updates, resource- and cost-loaded where the decisions call for it.
Analysis-ready data
Clean XER exports and coding that make health checks, risk models and delay analysis reliable.
Where Primavera P6 does its best work
Critical Path Method schedules with complete logic, grounded durations and a critical path you can manage by, report on and defend.
01.02Baseline Schedule DevelopmentApproved baseline schedules that capture scope, sequence and commitments precisely, and give both parties a reference point they have actually agreed.
01.03Integrated Master Scheduling (IMS)Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
01.12Resource LoadingLabor, equipment and cost loading that turns a schedule into a realistic plan for crews, machines and cash.
01.06Schedule UpdatesDisciplined periodic updates that record real progress, reveal real trends and keep the schedule a working tool rather than a filed document.
04.04Forensic SchedulingForensic reconstruction of as-planned and as-built schedules from the project record, analysed with methods recognised by AACE International and the SCL Protocol.
Integrated with the rest of your ecosystem
Make your platforms pay for themselves.
We will show you what the tools you already own can do when they are configured, integrated and run by people who live in them.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch