Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Market 3.04 · Industrial

Industrial, complexity made legible.

Process plants, heavy industrial facilities and large EPC programs where engineering, procurement and construction run at once.

Market3.04
Pressures3
Key services6
SectorIndustrial
StatusActive
The market

Industrial projects punish guesswork. They reward measurement.

Industrial work stacks civil, steel, piping, electrical and instrumentation around equipment that is often custom-built on another continent. Engineering is still issuing as procurement commits and construction mobilises. Interfaces multiply faster than anyone can track them by memory, and productivity shifts with weather, crews and logistics.

Schedola brings EPC-grade controls to owners and contractors: one integrated engineering, procurement and construction schedule; progress measured from installed quantities rather than opinions; and system-by-system completion planned toward commissioning and startup. Leaders see real progress, real productivity and a forecast built on both.

What is at stake

What keeps industrial leaders awake

The specific risks of this market, named plainly. We plan for them from day one, because we have worked inside them.

RISK-01

E, P and C in parallel

Engineering, procurement and construction overlapping, each waiting on something from the others.

RISK-02

Progress you can prove

Thousands of installed quantities that must be measured objectively to mean anything.

RISK-03

Ready to start up

Mechanical completion organised by system so that commissioning and operations can take over on time.

A plant is engineered to the millimetre. Its schedule deserves the same respect.
Our conviction in Industrial
Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

Do you work on EPC and EPCM contracts?

Yes. We plan and control engineering, procurement and construction as a single program for owners, EPC contractors and EPCM managers alike.

How do you measure progress on an industrial job?

With agreed rules of credit and installed-quantity tracking, which feed earned value and forecasting with physical evidence rather than estimates.

Explore further

Other markets

3.05

Manufacturing

Advanced manufacturing, automotive, battery and gigafactory programs where the business case is written around the first saleable unit.

3.06

Distribution Centers

Fulfilment, logistics and cold-storage facilities delivered in regional and national programs on tight, repeatable timelines.

3.07

Healthcare

Hospitals, medical centres and research facilities built and renovated while care continues next door.

3.08

Pharmaceutical

GMP manufacturing, laboratories and life-sciences facilities whose true finish is set by commissioning, qualification and validation.

3.09

Semiconductor

Fabs, cleanrooms and advanced packaging plants: some of the most complex and capital-intensive buildings ever attempted.

3.10

Food & Beverage

Processing, bottling and cold-chain facilities for brands people buy every week, often expanded inside plants that never stop.

3.11

Transportation

Highways, bridges, transit and rail programs delivered in full public view, with commuters, councils and taxpayers watching.

3.12

Aviation

Terminals, airside works, hangars and airport modernisation delivered while flights, passengers and security keep moving.

3.13

Water & Wastewater

Treatment plants, conveyance and resilience programs that must meet regulatory dates while the plant keeps treating.

3.14

Power

Generation, transmission, renewables and storage — the infrastructure that the grid, and every new data center, is waiting on.

3.15

Oil & Gas

Upstream, midstream and downstream capital projects, plant outages and brownfield work in demanding, hazardous environments.

3.16

Government

Federal, state and municipal capital programs held to strict standards of compliance, transparency and stewardship.

3.01

Data Centers

Hyperscale, colocation and AI campuses, where the real deadline is energised white space and the cost of a slip is counted in megawatts nobody can rent.

3.02

Mission Critical

Network hubs, operations and control centres, emergency services and secure facilities that are upgraded while they keep running.

3.03

Commercial

Office towers, mixed-use, hospitality and retail, where the completion date is already written into leases, loans and launch plans.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch