SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Delay & Claims

Delay Analysis

Retrospective and contemporaneous delay analysis that identifies the critical delays, measures them and allocates responsibility, using a method chosen to fit the records and the contract.

Practice04 Delay & Claims
Service01 of 07
Capabilities7
Deliverables7
StatusAvailable now
In short

What moved the finish date, by how much, and on whose account.

Every late project eventually faces three questions: which events delayed completion, by how many days, and who carries the risk of each? The answers decide extensions of time, liquidated damages, prolongation recovery and often the working relationship for the rest of the job.

We begin by assessing the schedules themselves. Were updates contemporaneous, statused honestly and logically sound? That assessment drives method selection. Where reliable updates exist, an observational contemporaneous period analysis (AACE MIP 3.3 or 3.4; the SCL Protocol’s as-planned versus as-built windows or time slice approach) usually gives the most persuasive answer. Where the record supports modelling, we may use a windowed time impact analysis (MIP 3.7) or a collapsed as-built (MIP 3.8). We explain the choice and its limitations in writing before any number is reported.

Concurrency and pacing get particular care. We test whether competing delays were truly concurrent on the critical path, distinguish them from a party pacing its work against a delay it did not cause, and apply the contract and governing law to the result. The outcome is a finding that a general counsel can rely on and a CFO can book.

What's included

What we bring to Delay Analysis

Senior practitioners, a proven method and the right technology. Every line below is part of the engagement, not an upsell.

C-01

Schedule assessment

Updates tested for statusing integrity, logic and reliability before they are used as evidence.

INCLUDED
C-02

Method selection

The AACE MIP and SCL approach that the records, contract and forum can actually support, with reasons stated.

INCLUDED
C-03

Critical and longest path

The controlling path identified in each analysis window, with near-critical paths tracked.

INCLUDED
C-04

Delay quantification

Days of delay attributed event by event, reconciled to the overall slip in completion.

INCLUDED
C-05

Concurrency and pacing

True concurrent delay distinguished from pacing and from sequential delay.

INCLUDED
C-06

Responsibility allocation

Delay apportioned between employer, contractor and neutral risk on stated criteria.

INCLUDED
C-07

Plain-language exhibits

Timelines and window charts a non-specialist can follow in minutes.

INCLUDED
How it works

A clear path, milestone by milestone.

A disciplined sequence, so you always know what happens next, who owns it and why it matters.

PHASE 01PHASE 02PHASE 03PHASE 04PHASE 05
PHASE 01Collect

We gather schedules, updates, daily reports, minutes and correspondence.

PHASE 02Assess

We test which schedules can carry evidential weight.

PHASE 03Select

We choose and document the method that fits the facts.

PHASE 04Analyse

We measure and allocate delay window by window.

PHASE 05Report

We present findings for negotiation or proceedings.

Deliverables

What you receive

  • 01Delay analysis report with method statement
  • 02Schedule reliability assessment
  • 03Delay event register with source references
  • 04Critical path summary by window
  • 05Concurrency and pacing assessment
  • 06Responsibility apportionment table
  • 07Native files and exhibit set
Platforms

Technology we work in

Platform-fluent and vendor-independent. We work inside your environment, or help you choose the one that fits. We take no reseller commissions.

Outcomes

What changes when we arrive.

Not more reports. Earlier warnings, firmer dates and decisions your board, lenders and teams can trust.

Outcome 01A defensible answer

One account of causation that survives scrutiny from the other side.

Outcome 02Known exposure

Liquidated damages and prolongation risk quantified early enough to act on.

Outcome 03Shorter arguments

Issues narrowed to the few that genuinely matter.

Questions, answered

What leaders ask us first.

Straight answers from the people who do the work. If your question is not here, ask us directly. A senior practitioner will reply.

Which delay analysis method is best?

No method is best in the abstract. AACE 29R-03 and the SCL Protocol both make the point that the choice depends on the contract, the quality of the contemporaneous schedules, the records available, the forum and proportionality. A project with honest monthly updates suits an observational windows analysis; a project with no usable updates may need a modified or recreated as-built. We state the method, why we chose it and what it cannot tell you.

What is concurrent delay, and why does it matter so much?

Under the SCL Protocol, true concurrent delay is the occurrence of two or more delay events at the same time, one an employer risk event and the other a contractor risk event, with both affecting completion. Many contracts and jurisdictions then give the contractor time but not money. Because the label shifts liquidated damages and prolongation costs, it is often the most contested finding in a case, and we test it rigorously rather than assume it.

Can delay analysis be done while the project is still running?

Yes, and it should be. A contemporaneous analysis at each update resolves entitlement while the people and facts are still on site, keeps notices timely and gives executives a straight answer about the forecast. It also costs a fraction of a retrospective reconstruction years later.

How do you treat pacing?

Pacing is a deliberate slowing of non-critical work in response to a delay on the critical path caused by the other party. It is not the same as concurrent delay. We look for contemporaneous evidence of the decision, such as instructions, minutes or resource changes, and treat pacing claims as unproven without it.

Start with one conversation

See your finish from here.

Tell us where your project stands today. In one conversation with a senior practitioner you will know where it is really heading, what is driving it, and what it will take to land it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch