Coastal Cable-Stayed Bridge Replacement
A crossing a coastal region had depended on for generations, replaced pylon by pylon and stay by stay.
LocationBrunswick, GATransportation work happens in the middle of people’s lives: their commute, their deliveries, their weekends. The best plan is one the public barely notices.
A new cable-stayed bridge replaced an aging crossing that carried a coastal region’s commuters and freight.
Marine works, hurricane seasons and a complex erection sequence made schedule risk a daily conversation.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
Hurricane seasons were built into the schedule with pre-planned demobilization windows.
Stay-cable installation was scheduled one cycle at a time.
Traffic shifted onto the new bridge within the target window.
What we brought to it
Critical Path Method schedules with complete logic, grounded durations and a critical path you can manage by, report on and defend.
02.09ForecastingRisk-informed schedule and cost forecasts that give executives a realistic finish date and final cost, with the confidence stated.
01.08Schedule Health AssessmentDiagnostics against the DCMA 14-Point Assessment, GAO guidance and field experience that show how far your schedule can really be trusted.
04.01Delay AnalysisRetrospective and contemporaneous delay analysis that identifies the critical delays, measures them and allocates responsibility, using a method chosen to fit the records and the contract.
More Transportation projects
TransportationCompleted 2022Greenway Trail Connector
- Value
- $31M
- Size
- 7.5 miles of trail · 3 bridges
- Client
- Confidential
TransportationIn progress · 2027Freeway-to-Freeway Interchange Rebuild
- Value
- $620M
- Size
- 12 bridges · 5 miles
- Client
- Confidential
TransportationCompleted 2024Regional Commuter Rail Corridor
- Value
- $740M
- Size
- 22 miles · 8 stations
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch