Lithium-Ion Cell Gigafactory
Thousands of workers through the gates each morning, and a schedule that tells every one of them where to go.
LocationCentral KentuckyNew manufacturing capacity is already in the customer’s plans before the building is closed in. The first production run is the date that counts.
A battery joint venture is building a cell factory to supply electric vehicle assembly plants. Dry rooms, formation lines and process utilities make it as demanding as a chip fab.
At peak, several thousand craft workers will be on site each day. Access, laydown and trade stacking must be choreographed at a scale few sites ever reach.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
More than 38,000 activities sit in a coded master schedule that leaders can filter in seconds.
Craft labor curves feed recruitment, housing and site logistics months in advance.
Earned value replaces percent-complete estimates with objective progress.
What we brought to it
Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
01.13Workforce PlanningWorkforce planning that forecasts, sources and sequences the skilled people your program depends on, before the schedule needs them.
02.06Earned Value Management (EVM)Earned value systems that join scope, schedule and cost to measure performance objectively and forecast with evidence.
02.01Project Controls ManagementSchedule, cost, change, risk and reporting set up, staffed and run by Schedola as one coordinated function.
02.12Construction IntelligenceAn intelligence layer that connects schedule, cost, field and document data and uses analytics and AI to show what is coming.
More Manufacturing projects
ManufacturingCompleted 2024Precision Components Manufacturing Campus
- Value
- $360M
- Size
- 940,000 sq ft
- Client
- Confidential
ManufacturingCompleted 2022Airframe Structures Production Facility
- Value
- $178M
- Size
- 325,000 sq ft
- Client
- Confidential
HealthcareCompleted 2024Coastal Outpatient Surgery & Imaging Campus
- Value
- $212M
- Size
- 174,000 sq ft · 3 buildings
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch