
University Hospital Acute Care Tower
Sixteen floors of beds for a city that has outgrown its hospital. The board can see the opening date from here.
LocationSan Antonio, TXA hospital that opens late is measured in people: the patient sent to another city for surgery, the nurse working in a ward that should have been replaced, the community still waiting. Owners need to see the opening date clearly from the first month, and to know what stands between them and the first patient.
A university hospital is replacing patient rooms in buildings that predate modern codes with a new sixteen-story acute care tower, stitched into an operating campus on three sides.
Thirty-plus trade partners, owner-furnished imaging, a central plant expansion and clinical activation all converge on the same short commissioning window at the end.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
Design, procurement, construction, equipment and activation sit in a single integrated master schedule.
Monthly quantified risk analysis replaces a single hopeful date with a confident range and its drivers.
Clinical move-in, training and readiness carry the same logic and rigor as the concrete and steel.
What we brought to it
Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
02.06Earned Value Management (EVM)Earned value systems that join scope, schedule and cost to measure performance objectively and forecast with evidence.
02.09ForecastingRisk-informed schedule and cost forecasts that give executives a realistic finish date and final cost, with the confidence stated.
02.11KPI ManagementFocused KPI frameworks that align teams, reward the right behaviour and show performance honestly.
02.01Project Controls ManagementSchedule, cost, change, risk and reporting set up, staffed and run by Schedola as one coordinated function.
More Healthcare projects
HealthcareCompleted 2024Coastal Outpatient Surgery & Imaging Campus
- Value
- $212M
- Size
- 174,000 sq ft · 3 buildings
- Client
- Confidential
HealthcareCompleted 2023Hybrid Cardiac Surgery Suite Rebuild
- Value
- $71M
- Size
- 9 operating rooms · 41,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Sterile Compounding Pharmacy Network Upgrade
- Value
- $54M
- Size
- 16 pharmacies
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch





