SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Semiconductor · ExpansionCompleted 2024

Chip Packaging Cleanroom Addition

A cleanroom built beside live production, with the production floor never knowing it was there.

LocationSherman, TX
ClientConfidential
LocationSherman, TX
SectorSemiconductor
Value$285M
Size110,000 sq ft ISO 6 cleanroom
DeliveryCM at Risk
Duration23 months
StatusCompleted 2024
Why it mattered

In advanced technology and life sciences, the building is an instrument. Utilities, cleanrooms and validation have to be right first time, because the tools and products inside are worth far more than the structure around them.

The challenge

A semiconductor company added a chip packaging cleanroom next to an operating production floor.

Cleanliness protocols, vibration limits and live tie-ins left no room for improvisation.

Schedule at a glance

The whole job, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.

StartAug 2022
Duration23 months
HandoverJul 2024
Progress—
Utilities ahead of toolsManage the interfacesCoordinate dailyQualify from the baseline
How we kept it on course

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Utilities ahead of tools

Utility systems sequenced for commissioning before tool or process installation begins.

PHASE 02Manage the interfaces

Hundreds of contractor interfaces held in one integrated schedule.

PHASE 03Coordinate daily

Look-ahead planning that kept thousands of workers moving in tightly constrained spaces.

PHASE 04Qualify from the baseline

Commissioning, qualification and validation built into the schedule from the first version.

What changed

The difference we made

Measured the only way that matters: did the project land where we said it would.

Result 01Certified first time

The cleanroom achieved its ISO classification at the first certification.

Result 02Production untouched

Live production was never interrupted by the works.

Result 03Tools on the planned date

Tool move-in began on the date the owner had set.

Your project, on schedule

Your project could be our next story.

Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch