Regional Cancer Institute & Proton Center
The accelerator’s delivery date was fixed a year out. Everything else was planned backward from that morning.
LocationLas Vegas, NVA hospital that opens late is measured in people: the patient sent to another city for surgery, the nurse working in a ward that should have been replaced, the community still waiting. Owners need to see the opening date clearly from the first month, and to know what stands between them and the first patient.
A health system set out to offer proton therapy in its region for the first time, inside a new cancer institute. The shielded vault walls run several meters thick, and the manufacturer set the accelerator’s delivery date more than a year in advance.
Mass concrete pours, shielding inspections, crane mobilization and rigging all had to land on that one fixed day, while clinics and infusion floors elsewhere in the building kept moving.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
The vault was poured, inspected and open for rigging on the morning the accelerator arrived.
The manufacturer’s installation sequence lived inside the master schedule, activity by activity.
Commissioning and clinical acceptance finished in time for the first planned patient.
What we brought to it
Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
01.07Critical Path AnalysisAnalysis of critical and near-critical paths that shows exactly where management attention and money will move the date.
01.18Commissioning & Startup SchedulingSystem-based commissioning and startup schedules that carry facilities from mechanical completion to reliable operation.
03.01Owner’s RepresentativeExperienced owner’s representation that protects your budget, dates and standards from planning through design, construction and occupancy.
More Healthcare projects
HealthcareCompleted 2024Coastal Outpatient Surgery & Imaging Campus
- Value
- $212M
- Size
- 174,000 sq ft · 3 buildings
- Client
- Confidential
HealthcareCompleted 2023Hybrid Cardiac Surgery Suite Rebuild
- Value
- $71M
- Size
- 9 operating rooms · 41,000 sq ft
- Client
- Confidential
HealthcareCompleted 2023Sterile Compounding Pharmacy Network Upgrade
- Value
- $54M
- Size
- 16 pharmacies
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch