SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Aviation · InfrastructureCompleted 2023

Airport Garage & Curbside Roadway Rebuild

Travelers kept arriving at the curb. Most never realized the curb had been rebuilt underneath them.

LocationEl Paso, TX
ClientConfidential
LocationEl Paso, TX
SectorAviation
Value$205M
Size5,200 spaces · 3 miles of roadway
DeliveryDesign-Build
Duration25 months
StatusCompleted 2023
Why it mattered

Transportation work happens in the middle of people’s lives: their commute, their deliveries, their weekends. The best plan is one the public barely notices.

The challenge

An airport rebuilt its departures and arrivals roadways and added a large parking garage to keep pace with passenger numbers.

Traffic switches had to happen overnight, and every phase was felt directly by travelers and drivers.

Schedule at a glance

The whole job, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.

StartJun 2021
Duration25 months
HandoverJul 2023
Progress—
Model each phaseTrack the third partiesKeep the record currentPlan the opening
How we kept it on course

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Model each phase

Every traffic or track phase modelled with its own critical path and switch dates.

PHASE 02Track the third parties

Utilities, railroads and agencies carried as external milestones with named owners.

PHASE 03Keep the record current

Delay events documented and time impact analysis prepared as they happened, not afterwards.

PHASE 04Plan the opening

Testing, inspections and opening to traffic or revenue service planned in detail.

What changed

The difference we made

Measured the only way that matters: did the project land where we said it would.

Result 01Overnight switches on time

Each traffic phase was made within its planned overnight window.

Result 02Holiday peaks avoided

Major switches were kept clear of peak travel weeks.

Result 03Garage open early

The garage opened ahead of the holiday travel season.

Your project, on schedule

Your project could be our next story.

Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch