
Airport Terminal & Checkpoint Expansion
A new front door for a growing city, built while every morning departure still pushes back on time.
LocationOmaha, NEAn airport never closes. Every phase has to keep passengers moving, aircraft turning and screening working, while the new terminal takes shape beside the old one.
A mid-size airport is adding gates, a consolidated security checkpoint and new concessions, while the existing terminal handles every flight.
Airside work, security requirements and airline gate commitments make phasing as critical as the construction itself.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
Phasing keeps gates and checkpoint lanes open through every stage.
Airlines, security and concessionaires all work from the same schedule.
Operational readiness and terminal transfer are fully scheduled.
What we brought to it
Integrated Master Schedules that connect design, procurement, construction and commissioning into a single program view, traceable from the boardroom summary down to the field.
01.05Milestone PlanningMilestone frameworks that align contracts, payments, stakeholders and teams around the dates that actually carry consequences.
02.01Project Controls ManagementSchedule, cost, change, risk and reporting set up, staffed and run by Schedola as one coordinated function.
02.10Executive ReportingShort, honest, decision-led reporting and live executive views for boards, CFOs, lenders and public stakeholders.
More Aviation projects
AviationIn progress · 2028Hub Airport Concourse Program
- Value
- $960M
- Size
- New concourse · 22 gates
- Client
- Confidential
AviationCompleted 2023Airport Garage & Curbside Roadway Rebuild
- Value
- $205M
- Size
- 5,200 spaces · 3 miles of roadway
- Client
- Confidential
Food & BeverageCompleted 2024High-Bay Frozen Distribution Addition
- Value
- $104M
- Size
- 115 ft rack-supported ASRS
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch





