Aquifer Wellfield & Transmission Expansion
Fifty-two miles of pipe, eighteen wells and a new treatment plant, built so a booming corridor never runs dry.
LocationBastrop, TXWater infrastructure goes unnoticed until it fails. These programs protect public health for decades, often under regulatory deadlines, and have to be built while every tap and every treatment process keeps working.
A water supply corporation needed new groundwater capacity for member cities whose populations were climbing every year.
Easement acquisition, two river crossings and a new treatment facility each carried their own risk, and all three met at a single in-service date.
The whole job, on one line.
Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.
Our approach, phase by phase.
The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

The difference we made
Measured the only way that matters: did the project land where we said it would.
Member cities received supply on the date written into their contracts.
Right-of-way acquisition was scheduled and tracked weekly, one parcel at a time.
Contemporaneous schedule documentation was kept to a standard that would withstand any claim review.
What we brought to it
Critical Path Method schedules with complete logic, grounded durations and a critical path you can manage by, report on and defend.
01.06Schedule UpdatesDisciplined periodic updates that record real progress, reveal real trends and keep the schedule a working tool rather than a filed document.
04.05Claims SupportPreparation, review and defence of construction claims for delay, disruption, acceleration and change, in close partnership with counsel.
02.06Earned Value Management (EVM)Earned value systems that join scope, schedule and cost to measure performance objectively and forecast with evidence.
More Water & Wastewater projects
Water & WastewaterIn progress · 2027Regional Water Supply Resilience Program
- Value
- $295M
- Size
- 11 projects · 1 program
- Client
- Confidential
Water & WastewaterIn progress · 2027Water Reclamation Facility Capacity Expansion
- Value
- $410M
- Size
- +24 MGD capacity
- Client
- Confidential
HealthcareIn progress · 2027University Hospital Acute Care Tower
- Value
- $860M
- Size
- 760,000 sq ft · 16 stories
- Client
- Confidential
Your project could be our next story.
Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.
- Senior practitioner on the first call
- Confidential by default
- A straight answer, not a sales pitch