SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Water & Wastewater · ExpansionIn progress · 2027

Water Reclamation Facility Capacity Expansion

Every gallon that arrives still has to be treated. The expansion works around that, not the other way round.

LocationArlington, TX
ClientConfidential
LocationArlington, TX
SectorWater & Wastewater
Value$410M
Size+24 MGD capacity
DeliveryCM at Risk
Duration50 months
StatusTarget 2027
Why it mattered

Water infrastructure goes unnoticed until it fails. These programs protect public health for decades, often under regulatory deadlines, and have to be built while every tap and every treatment process keeps working.

The challenge

A city utility is adding twenty-four million gallons a day of treatment capacity to meet growth and a tighter discharge permit, while the existing plant handles every inflow.

Process tie-ins, temporary bypass pumping and regulatory deadlines make this one of the most constrained schedules in the region.

Schedule at a glance

The whole job, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.

StartMay 2023
Duration50 months
Target finishJul 2027
Progress—
Structure the programMatch money to workPlan the tie-insKeep the record
How we kept it on course

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Structure the program

Projects, funding sources, permits and outage windows brought together in one master schedule.

PHASE 02Match money to work

Cash-flow forecasts aligned with grant and loan draws and board approval dates.

PHASE 03Plan the tie-ins

Bypasses and service outages placed in low-demand periods, each with a tested contingency.

PHASE 04Keep the record

Contemporaneous schedule records maintained to stand up to any audit, regulator or claim.

What changed

The difference we made

Measured the only way that matters: did the project land where we said it would.

Result 01Permit dates as hard stops

Every regulatory deadline sits in the schedule as a fixed milestone.

Result 02Low-flow windows used well

Critical tie-ins are placed in dry-season flows, with contingency set aside for each.

Result 03Leadership on one page

A monthly summary shows progress, risk and forecast together for the utility director.

Your project, on schedule

Your project could be our next story.

Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch