SchedolaProject Controls
Services

5 practices.
One line of sight.

All practices & services →
04 · 7 services

Delay & Claims

Forensic delay analysis, time and money entitlement, and independent expert evidence that holds up under cross-examination.

Open
05 · 7 services

Digital Delivery

BIM, 4D and 5D, reality capture and digital twins, wired into the schedule and the budget.

Open
Featured practice

The finish line, visible from day one.

About Schedola

Clarity is a discipline.

Founded by Colins Epie to give every capital project a clear line of sight to its finish.

Overview
Markets

16 markets. One standard of clarity.

Sector fluency, applied with the same discipline everywhere.

Overview
Projects

$19.56B of capital, in plain sight.

60 featured projects across 17 sectors. Every client confidential.

Overview
Insights

Field notes for people who build.

Research, papers and plain-spoken guidance from our practitioners.

Overview
Careers

Do work you can see finished.

Careers for people who would rather know than hope.

Overview
Power & Energy · New ConstructionCompleted 2024

Utility-Scale Solar & Battery Portfolio

Five sites, one grid, and a set of tax-credit deadlines that turned the schedule into a financial document.

LocationPermian Basin, TX
ClientConfidential
LocationPermian Basin, TX
SectorPower & Energy
Value$590M
Size5 sites · 1.1 GW
DeliveryEPC
Duration27 months
StatusCompleted 2024
Why it mattered

In energy, days convert directly into money. Interconnection dates, outage windows and tax-credit deadlines leave very little room for surprises.

The challenge

A renewable developer built five solar and battery storage sites at once.

Interconnection dates, module deliveries and tax-credit qualification deadlines made every milestone worth real money.

Schedule at a glance

The whole job, on one line.

Start to finish, as the schedule tells it. For work still in progress, the bar moves with today's date.

StartApr 2022
Duration27 months
HandoverJul 2024
Progress—
Plan outages by the hourProtect the commercial datesMeasure real progressBring capacity online
How we kept it on course

Our approach, phase by phase.

The same disciplined sequence we bring to every engagement, shaped around what this project needed most.

PHASE 01PHASE 02PHASE 03PHASE 04
PHASE 01Plan outages by the hour

Outages planned at hour level with every craft, permit and isolation accounted for.

PHASE 02Protect the commercial dates

Interconnection, tax-credit and offtake dates held as hard milestones.

PHASE 03Measure real progress

Installed-quantity progress and earned value on every site.

PHASE 04Bring capacity online

Startup and testing sequenced to bring capacity back, or online, on the planned date.

What changed

The difference we made

Measured the only way that matters: did the project land where we said it would.

Result 01Grid connections on time

Each site energized on its committed interconnection date.

Result 02Credits protected

Qualification milestones were tracked and met at every site.

Result 03Progress seen from above

Drone surveys verified installed progress across all five sites each month.

Your project, on schedule

Your project could be our next story.

Tell us what you are building and the date that matters. In one conversation you will know what it will take to hit it.

  • Senior practitioner on the first call
  • Confidential by default
  • A straight answer, not a sales pitch